Sunday, May 20, 2012

Green Floors!!!

Ok, so its been awhile since the last post and a lot has happened. Most noticeably, the floor is green!!



We covered the brewery floor with three coats of epoxy to protect it from the chemicals we will use to insure a clean and consistent brew every time. We chose green because we thought it would look cool. I like how the color shines off of the bottom of the tanks.

We have also made progress in our taproom.



There's a few things left to do, but the taproom is coming along nicely.

However, the most important news I have to share with you is that Turtle Anarchy Brewing Company has received its Brewer's Notice! That means, according to the federal government, we are legally allowed to brew beer. So it is expected that we will begin test brews next week. It has been a long time coming and I can't wait. Pretty soon we will be pouring beer!!

Cheers

Wednesday, April 11, 2012

We have made lots of progress

So, I realized today that I haven't posted in quite a while. We have made a lot of progress over the last few weeks. Insulation and drywall were hung, the taproom was painted, and lighting was installed in the taproom. Our most important achievement, however, was placing our brewhouse. We were finally able to organize the heaping pile of tanks in the middle of the floor into the integrated, beer-making machine it is intended to be.

From left to right, there's the hot liquor tank (hot water), the mash tun, the brew kettle, and the cold liquor tank (cold water). That metal box in front of the hot liquor tank is the grist case. The grist case holds the malt after it has been milled but before it is transferred into the mash tun.

The following photos are of our taproom. We just started framing the bar yesterday!!



Lastly, I am particularly proud of our large walk-in cooler that my dad and I constructed last week. We had to move the door, which meant cutting a new doorway in the side. That left a rather big hole where the door was originally meant to go... so we built a wall.


In case you are wondering, it's not wood on the inside. We can't wait to fill this cooler full of beer!!!


As always, I'll post more photos on Facebook.

Thursday, March 22, 2012

We made the news!!

For those of you that do not know, the brewery has received some media attention recently! We were featured in an article in the Tennessean on Monday and we appeared in the 10 o'clock news that night on WKRN. Both interviews were very thorough and well done. I would like to thank the two journalists for their interest in the brewery. The following links should take you to the written and video interviews.

The Tennessean
http://www.tennessean.com/article/20120319/NEWS01/303190013/Nashville-craft-beer-scene-hopping-these-days

WKRN
http://www.wkrn.com/story/17195960/middle-tennessee-sees-surge-in-micro-breweries

As far as construction goes, the electricians have been very busy getting power to all the various lights, fans, and outlets that will be in our building. We will be insulating the walls and hanging drywall starting next week. That means we will finally be able to set the brewhouse into place and stand up the walk-in coolers. We also received the glycol chiller (photo below) on Tuesday and its huge. This unit will deliver glycol refrigerant to the fermenting tanks and the brite beer tank. It keeps the beer at the desired temp and is crucial in the brewing process.



This is a photo of our brewhouse control panel. I just had to post it here since it is frickin' awesome!


Stay tuned, I'll be posting a lot more photos after the drywall is hung and the brewhouse is placed.

Saturday, March 10, 2012

The brewery is taking shape

It has been a little while since I posted any info. So I thought today would be a good day to bring everyone up to date.

We have made a bit of progress since we stood the tanks up a couple weeks ago. We have spent a lot of time (and a lot of money) transforming an empty warehouse into what will be an awesome brewery and taproom.

These first couple photos were taken during the first or second day of framing. From left to right, there's my office, women's room, men's room, and then the janitor's closet.




In this next photo, I'm standing behind our future bar and looking down toward our janitor's closet. Once the sheetrock goes up, those tanks to the right will be moved within a couple feet of the wall (the one between the two ladders laying on the floor) to form the brewhouse.

There's a lot more work to be done but we are making solid progress every week. Next week, we will be getting started on the electrical work. I can't express how excited we are to start brewing beer! More info to follow.

On a side note, I want to wish everyone a wonderful and safe visit to the Franklin Beer Festival next weekend. There will be a lot of great beer and a lot of great people there as always. We will be there next year.


Friday, February 24, 2012

Standing Up the Tanks!!

Every brewery, regardless of location, shares one common event: the raising of the tanks. For those with ample ceiling height, raising the tanks is a relatively simple process. The braces on the top of the each tank are tied to a forklift or crane and the tank is lifted and set into position. For those with less than ideal ceiling height, the process is not as straightforward. Turtle Anarchy happens to fall into the latter category.

Standing up our tanks took two highly skilled forklift operators from The Bailey Company two days to complete. It was a very tedious process but necessary considering that we do actually want to produce beer some day.

The first tank to be raised was our brite beer tank. It was a good tank to start with since it is one of the shorter tanks. Since there wasn't enough ceiling height for a crane, each tank was lifted as high as it could be with the forklift and then pushed over onto its feet. It was kinda scary.




The next tanks that we stood up were our four fermenters. These tanks are 13.5' tall. As you can see in the photos, there wasn't much room above the tanks. The mast of the forklift actually had to be maneuvered around the support beams, electrical conduit, and sprinkler pipes all while lifting the tank!



In the end all of the tanks were successfully raised without any problems. The brewhouse and hot and cold water tanks will be moved to their final locations after some framing is completed. (I'll have info and photos of the framing soon!) I would like to thank the forklift operators for their time and patience with this delicate process. These tanks are more fragile than they look. I would also like to let them know that they are now my go-to guys for all my brewery tank logistical needs. Thanks guys!!


More photos on Facebook

Sunday, February 12, 2012

Construction Begins

So, construction began at our building a little over a week ago and I finally have time to show you all the progress we have made.

The first step was to remove a large section of concrete in the middle of the building where all the tanks will eventually stand.


The next two photos show the jackhammer at work. They filled up 3 or 4 dump trucks with concrete waste and it took them about a day and a half to do it. After they removed the concrete, they sloped the the earth in the resulting hole toward the future trench drain.



The next couple photos show the trench drain before and after it was installed.



After all of the drains were installed, the vapor barrier and mesh was laid and we were ready for new concrete.


Pouring concrete took all day but in the end the concrete came out perfect. The floor in a brewery is just as important as the rest of the equipment. It must be strong enough to hold the fluctuating weight of the tanks (my tanks will weigh 1,500 lbs. when empty and 10,000 lbs. when full) and maintain its integrity under constant water and chemical abuse.




This is probably the best photo of the slope in the floor. The slope will insure that any water that falls within the boundaries of the new concrete will make its way to the trench drain. Water gets sprayed everywhere when brewing and the sloped concrete will be a big help when trying to control where all that water goes.

These last photos were taken the day after the concrete was poured. It was hard enough to walk on and I can't wait to get the tanks stood up in a couple weeks!


Watch out for more construction photos on this blog. And I will be posting more photos on Facebook shortly.

Tuesday, February 7, 2012

The Much Awaited Tank Deliveries!

Hello everyone,

As promised, here are some photos of our brewery tanks being delivered. The fermenters and hot and cold liquor tanks were delivered first. The first photo shows the top of one of our fermenters as it is about to be pulled out of the truck. They fit three of them in one truck!!


Here is one of the fermenters as it is about to be pushed into the brewery (well, what will become the brewery).

Here you can see all six tanks that were delivered during the first day. Looking from left to right, there are the four fermenters, the hot liquor tank, and the cold liquor tank. There were some tense moments as the tanks were lowered out of the trucks and onto the ground, but they all made it safely into the building!


The next two photos are of the second tank delivery. We received the mash tun, the brew kettle, the platform, and a mystery box. Now we just have to get all this set up and start making some beer!!